United States › Grid › Interconnection queues › Utah
HYDRO · WESTHydro project 732, Cache County
Hydro project 732, Cache County is a 0.3 MW hydro request built and operating in the West interconnection queue, in Cache County, Utah, connecting to PacifiCorp.
Request details
- Queue ID
- 732
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- Richmond Irrigation Company
- Connection point (POI)
- Circuit RMD 12 out of Richmond substation
- Location
- Cache County, Utah
- Technology
- Hydro: 0.3 MW
- Total requested
- 0.3 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA signed 10/11/16
- Queue status
- Operational
- Entered queue
- 8 March 2016
- Agreement signed
- 11 October 2016
- Proposed online date
- May 2017
Location
Marker shows the centre of Cache County; the queue data does not give exact sites.
Other requests in Cache County
- Solar + storage project PIS038, Cache CountySolar + storage · 150 MW · withdrawn
- Solar + storage project C2-205, Cache CountySolar + storage · 150 MW · withdrawn
- Solar + storage project 1024, Cache CountySolar + storage · 100 MW · withdrawn
- Solar project 1039, Cache CountySolar · 30.0 MW · withdrawn
- Hydro project 704, Cache CountyHydro · 0.2 MW · withdrawn
- Hydro project 686, Cache CountyHydro · 0.2 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem