Solar + storage project PIS038, Cache County

Solar + storage project PIS038, Cache County is a 150 MW solar + storage request withdrawn in the West interconnection queue, in Cache County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
PIS038
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Bridgerland-Cache transmission line
Location
Cache County, Utah
Technology
Solar: 150 MW Β· Battery
Total requested
150 MW
Service type
Energy only (ERIS)
Study phase
Underlying Interconnection Request Withdrawn
Queue status
Withdrawn
Entered queue
10 May 2023
Proposed online date
October 2026

Location

Marker shows the centre of Cache County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Cache County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem