United States βΊ Grid βΊ Interconnection queues βΊ Michigan
ONSHORE WIND Β· MISOOnshore wind project J147, Chippewa County
Onshore wind project J147, Chippewa County is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Chippewa County, Michigan.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2010 (completed)
- Withdrawn / abandonedMar 2013 (project stopped here)
- ConsentedMar 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J147
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- ATC 9-mile switching
- Location
- Chippewa County, Michigan
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 28 June 2010
- Agreement signed
- 18 March 2013
- Proposed online date
- May 2010
- Withdrawn
- March 2013
Location
Marker shows the centre of Chippewa County; the queue data does not give exact sites.
Other requests in Chippewa County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem