United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G663, Lincoln County

Onshore wind project G663, Lincoln County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Lincoln County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2006 (completed)
  2. Withdrawn / abandonedOct 2013 (project stopped here)
  3. ConsentedOct 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G663
Grid region
MISO (Midcontinent)
Connection point (POI)
Yankee 34.5kV Substation
Location
Lincoln County, Minnesota
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
7 August 2006
Agreement signed
9 October 2013
Proposed online date
December 2010
Withdrawn
October 2013

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem