Solar project 164, Apache County

Solar project 164, Apache County is a 250 MW solar request withdrawn in the West interconnection queue, in Apache County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
164
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
Springerville 345kV Substation
Location
Apache County, Arizona
Technology
Solar: 250 MW
Total requested
250 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
29 September 2023
Proposed online date
December 2028

Location

Marker shows the centre of Apache County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Apache County