United States βΊ Grid βΊ Interconnection queues βΊ Arizona
ONSHORE WIND Β· WESTOnshore wind project Q75, Apache County
Onshore wind project Q75, Apache County is a 1,500 MW onshore wind request withdrawn in the West interconnection queue, in Apache County, Arizona, connecting to Salt River Project.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Q75
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Salt River Project
- Connection point (POI)
- Coronado 500 kV
- Location
- Apache County, Arizona
- Technology
- Wind: 1,500 MW
- Total requested
- 1,500 MW
- Queue status
- Withdrawn
- Entered queue
- 19 April 2021
- Proposed online date
- April 2028
Location
Marker shows the centre of Apache County; the queue data does not give exact sites.
Other requests in Apache County
- Solar + storage project 125, Apache CountySolar + storage Β· 1,000 MW Β· in study
- Other project 103, Apache CountyOther Β· 768 MW Β· in study
- Solar + storage project 93, Apache CountySolar + storage Β· 700 MW Β· in study
- Other project 78, Apache CountyOther Β· 300 MW Β· in study
- Onshore wind project 118, Apache CountyOnshore wind Β· 300 MW Β· in study
- Other project 112, Apache CountyOther Β· 250 MW Β· in study
- Other project 87, Apache CountyOther Β· 250 MW Β· in study
- Other project 86, Apache CountyOther Β· 250 MW Β· in study
- Other project 95, Apache CountyOther Β· 250 MW Β· in study
- Other project 77, Apache CountyOther Β· 200 MW Β· in study
- Other project Q82, Apache CountyOther Β· 1,300 MW Β· withdrawn
- Onshore wind project Q74, Apache CountyOnshore wind Β· 1,000 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem