πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

ONSHORE WIND Β· WEST

Onshore wind project Q75, Apache County

Onshore wind project Q75, Apache County is a 1,500 MW onshore wind request withdrawn in the West interconnection queue, in Apache County, Arizona, connecting to Salt River Project.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q75
Grid region
West (non-ISO utilities)
Utility / transmission owner
Salt River Project
Connection point (POI)
Coronado 500 kV
Location
Apache County, Arizona
Technology
Wind: 1,500 MW
Total requested
1,500 MW
Queue status
Withdrawn
Entered queue
19 April 2021
Proposed online date
April 2028

Location

Marker shows the centre of Apache County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Apache County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem