ONSHORE WIND Β· SPPOnshore wind project GEN-2023-182, Logan County
Onshore wind project GEN-2023-182, Logan County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Logan County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-182
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Groton - Leland Olds 345 kV Line
- Location
- Logan County, North Dakota
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2026
- Withdrawn
- August 2025
Location
Marker shows the centre of Logan County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Logan County
- Onshore wind project GI-0804, Logan CountyOnshore wind Β· 672 MW Β· withdrawn
- Onshore wind project GEN-2016-044, Logan CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GI-0707a, Logan CountyOnshore wind Β· 286 MW Β· withdrawn
- Onshore wind project J607, Logan CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project J3091, Logan CountyOnshore wind Β· 145 MW Β· withdrawn
- Battery storage project GEN-2023-181, Logan CountyBattery storage Β· 100 MW Β· withdrawn
- Onshore wind project GI-0616, Logan CountyOnshore wind Β· 81.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem