United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2006-037N, Cherry County
Onshore wind project GEN-2006-037N, Cherry County is a 101 MW onshore wind request withdrawn in the SPP interconnection queue, in Cherry County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2006 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2006-037N
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Location
- Cherry County, Nebraska
- Technology
- Wind: 101 MW
- Total requested
- 101 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 15 September 2006
Location
Marker shows the centre of Cherry County; the queue data does not give exact sites.
Other requests in Cherry County
- Onshore wind project GEN-2020-069, Cherry CountyOnshore wind Β· 52.9 MW Β· in study
- Onshore wind project GEN-2013-024, Cherry CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2010-024, Cherry CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GEN-2006-038N, Cherry CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GEN-2016-027, Cherry CountyOnshore wind Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem