United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

ONSHORE WIND Β· WEST

EA100W Project

EA100W Project is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Chaves County, New Mexico, connecting to El Paso Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedSep 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LG19-3-6
Grid region
West (non-ISO utilities)
Utility / transmission owner
El Paso Electric Company
Connection point (POI)
Empire Substation
Location
Chaves County, New Mexico
Technology
Wind: 100 MW
Total requested
100 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
30 March 2019
Proposed online date
September 2021
Withdrawn
September 2019

Location

Marker shows the centre of Chaves County; the queue data does not give exact sites.

Power plants in New Mexico Β· Transmission lines in New Mexico

Other requests in Chaves County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem