United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J080, Brookings County
Onshore wind project J080, Brookings County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Brookings County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2009 (completed)
- Withdrawn / abandonedSep 2011 (project stopped here)
- ConsentedSep 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J080
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Brookings County 345 kV substation
- Location
- Brookings County, South Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 5 October 2009
- Agreement signed
- 19 September 2011
- Proposed online date
- December 2011
- Withdrawn
- September 2011
Location
Marker shows the centre of Brookings County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Brookings County
- Solar project J3964, Brookings CountySolar Β· 490 MW Β· in study
- Solar project J3963, Brookings CountySolar Β· 490 MW Β· in study
- Gas project E0034, Brookings CountyGas Β· 265 MW Β· in study
- Gas project GI-0704, Brookings CountyGas Β· 240 MW Β· built
- Onshore wind project G255, Brookings CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project J432, Brookings CountyOnshore wind Β· 98.0 MW Β· built
- Gas project GI-0716, Brookings CountyGas Β· 60.0 MW Β· built
- Other project GI-0405, Brookings CountyOther Β· 8.0 MW Β· built
- Gas project G765, Brookings CountyGas Β· 240 MW Β· withdrawn
- Onshore wind project GI-0312, Brookings CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GI-0108, Brookings CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G776, Brookings CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem