πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

BATTERY STORAGE Β· MISO

Battery storage project J1881, Decatur County

Battery storage project J1881, Decatur County is a 48.0 MW battery storage request withdrawn in the MISO interconnection queue, in Decatur County, Indiana, connecting to HOOSIER ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedNov 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1881
Grid region
MISO (Midcontinent)
Utility / transmission owner
HOOSIER ENERGY
Connection point (POI)
Decatur Switching Station 161kV
Location
Decatur County, Indiana
Technology
Battery: 48.0 MW
Total requested
48.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2
Queue status
Withdrawn
Entered queue
16 August 2021
Proposed online date
September 2024
Withdrawn
November 2021

Location

Marker shows the centre of Decatur County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Decatur County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem