United States βΊ Grid βΊ Interconnection queues βΊ Indiana
SOLAR Β· MISOSolar project J1825, Decatur County
Solar project J1825, Decatur County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Decatur County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1825
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Westport
- Location
- Decatur County, Indiana
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 June 2020
- Proposed online date
- October 2024
- Withdrawn
- December 2020
Location
Marker shows the centre of Decatur County; the queue data does not give exact sites.
Other requests in Decatur County
- Battery storage project J1354, Decatur CountyBattery storage Β· 146 MW Β· agreement signed
- Solar project AG2-219, Decatur CountySolar Β· 330 MW Β· withdrawn
- Solar project AG2-164, Decatur CountySolar Β· 270 MW Β· withdrawn
- Battery storage project AG2-331, Decatur CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project J1687, Decatur CountySolar Β· 160 MW Β· withdrawn
- Solar project J1717, Decatur CountySolar Β· 150 MW Β· withdrawn
- Solar project J1878, Decatur CountySolar Β· 145 MW Β· withdrawn
- Solar project J1715, Decatur CountySolar Β· 145 MW Β· withdrawn
- Solar project J1876, Decatur CountySolar Β· 140 MW Β· withdrawn
- Solar project J804, Decatur CountySolar Β· 119 MW Β· withdrawn
- Battery storage project J1881, Decatur CountyBattery storage Β· 48.0 MW Β· withdrawn
- Battery storage project J1877, Decatur CountyBattery storage Β· 45.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem