United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

SOLAR Β· WEST

Solar project 389-B, Lake County

Solar project 389-B, Lake County is a 5.0 MW solar request withdrawn in the West interconnection queue, in Lake County, Oregon, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
389-B
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Circuit 5L100 out of Mile Hi substation
Location
Lake County, Oregon
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
Resubmitted as Q392
Queue status
Withdrawn
Entered queue
20 May 2011
Proposed online date
December 2011

Location

Marker shows the centre of Lake County; the queue data does not give exact sites.

Power plants in Oregon Β· Transmission lines in Oregon

Other requests in Lake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem