United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2021-022, Kiowa County
Onshore wind project GEN-2021-022, Kiowa County is a 75.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Kiowa County, Kansas, connecting to SUNC.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-022
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SUNC
- Connection point (POI)
- Greensburg 115 kV Substation
- Location
- Kiowa County, Kansas
- Technology
- Wind: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 20 April 2021
- Proposed online date
- December 2026
- Withdrawn
- July 2023
Location
Marker shows the centre of Kiowa County; the queue data does not give exact sites.
Other requests in Kiowa County
- Onshore wind project GEN-2001-039A, Kiowa CountyOnshore wind Β· 104 MW Β· built
- Onshore wind project GEN-2022-194, Kiowa CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2012-012, Kiowa CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2022-190, Kiowa CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem