SOLAR Β· PJM

Wild Sky Storage

Wild Sky Storage is a 170 MW solar request withdrawn in the PJM interconnection queue, in Mckean County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-589
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Developer
RWE Solar Development, LLC
Connection point (POI)
Lewis Run - Pierce Brook 230 kV
Location
Mckean County, Pennsylvania
Technology
Solar: 170 MW
Total requested
170 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
29 January 2025
Proposed online date
December 2024
Withdrawn
December 2025

Location

Marker shows the centre of Mckean County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Mckean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem