United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR + STORAGE Β· MISOSolar + storage project J2827, Hinds County
Solar + storage project J2827, Hinds County is a 200 MW solar + storage request withdrawn in the MISO interconnection queue, in Hinds County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2827
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- Norrell 230kV Substation
- Location
- Hinds County, Mississippi
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- March 2025
- Withdrawn
- July 2025
Location
Marker shows the centre of Hinds County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Hinds County
- Solar project J1672, Hinds CountySolar Β· 150 MW Β· agreement signed
- Lakeover CCCTGas Β· 820 MW Β· in study
- Solar + storage project J2173, Hinds CountySolar + storage Β· 396 MW Β· in study
- Gas project J477, Hinds CountyGas Β· 36.4 MW Β· built
- Gas project J3825, Hinds CountyGas Β· 770 MW Β· withdrawn
- Solar project J2595, Hinds CountySolar Β· 650 MW Β· withdrawn
- Solar project J2594, Hinds CountySolar Β· 650 MW Β· withdrawn
- Solar project J1640, Hinds CountySolar Β· 200 MW Β· withdrawn
- Solar project J910, Hinds CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project J3062, Hinds CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project J1136, Hinds CountySolar Β· 100 MW Β· withdrawn
- Solar project J2370, Hinds CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem