United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
BATTERY STORAGE Β· PJMBattery storage project AH1-252, Barbour County
Battery storage project AH1-252, Barbour County is a 100 MW battery storage request withdrawn in the PJM interconnection queue, in Barbour County, West Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-252
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Wharton - Sundial 138 kV
- Location
- Barbour County, West Virginia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 September 2021
- Proposed online date
- December 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Barbour County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Barbour County
- Mount Storm RepowerOnshore wind Β· 171 MW Β· in study
- Solar project AG2-423, Barbour CountySolar Β· 80.0 MW Β· in study
- Laurel Mountain WFOnshore wind Β· 97.6 MW Β· built
- Laurel Mountain BTBattery storage Β· 27.4 MW Β· built
- Onshore wind project U4-017, Barbour CountyOnshore wind Β· 165 MW Β· withdrawn
- Onshore wind project V2-026, Barbour CountyOnshore wind Β· 164 MW Β· withdrawn
- Battery storage project AG2-011, Barbour CountyBattery storage Β· 56.3 MW Β· withdrawn
- Laurel Mountain Wind Farm & Energy Storage FacilityWind + storage Β· 16.3 MW Β· withdrawn