United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
ONSHORE WIND Β· PJMOnshore wind project U4-017, Barbour County
Onshore wind project U4-017, Barbour County is a 165 MW onshore wind request withdrawn in the PJM interconnection queue, in Barbour County, West Virginia, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2008 (completed)
- Withdrawn / abandonedJun 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U4-017
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Corder Crossing 138kV
- Location
- Barbour County, West Virginia
- Technology
- Wind: 165 MW
- Total requested
- 165 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 November 2008
- Proposed online date
- December 2012
- Withdrawn
- June 2009
Location
Marker shows the centre of Barbour County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Barbour County
- Mount Storm RepowerOnshore wind Β· 171 MW Β· in study
- Solar project AG2-423, Barbour CountySolar Β· 80.0 MW Β· in study
- Laurel Mountain WFOnshore wind Β· 97.6 MW Β· built
- Laurel Mountain BTBattery storage Β· 27.4 MW Β· built
- Onshore wind project V2-026, Barbour CountyOnshore wind Β· 164 MW Β· withdrawn
- Battery storage project AH1-252, Barbour CountyBattery storage Β· 100 MW Β· withdrawn
- Battery storage project AG2-011, Barbour CountyBattery storage Β· 56.3 MW Β· withdrawn
- Laurel Mountain Wind Farm & Energy Storage FacilityWind + storage Β· 16.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem