United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 16

Gas project 16 is a 1,190 MW gas request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
SGS Switchyard
Location
Florida
Technology
Gas: 1,190 MW
Total requested
1,190 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: N/A; Status: Withdrawn and replaced by Queue 19
Queue status
Withdrawn
Entered queue
5 May 2016
Proposed online date
March 2020

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem