Onshore wind project GI-0303, Brookings County

Onshore wind project GI-0303, Brookings County is a 170 MW onshore wind request withdrawn in the West interconnection queue, in Brookings County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0303
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Developer
Heartland Wind, LLC
Connection point (POI)
White 115kV
Location
Brookings County, South Dakota
Technology
Wind: 170 MW
Total requested
170 MW
Service type
Energy only (ERIS)
Study phase
IAE
Queue status
Withdrawn
Entered queue
10 March 2003
Proposed online date
August 2011

Location

Marker shows the centre of Brookings County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Brookings County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem