SOLAR + STORAGE Β· PJM

Solar + storage project AG2-317, Barren County

Solar + storage project AG2-317, Barren County is a 35.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Barren County, Kentucky, connecting to EKPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-317
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
EKPC
Connection point (POI)
Barren - Summer Shade 161 kV
Location
Barren County, Kentucky
Technology
Solar: 35.0 MW Β· Battery
Total requested
35.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
24 March 2021
Proposed online date
June 2024
Withdrawn
December 2024

Location

Marker shows the centre of Barren County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Barren County