United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· PJMSolar project AF1-163, Barren County
Solar project AF1-163, Barren County is a 120 MW solar request withdrawn in the PJM interconnection queue, in Barren County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedDec 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-163
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Barren-Summer Shade 161 kV
- Location
- Barren County, Kentucky
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 20 September 2019
- Proposed online date
- June 2022
- Withdrawn
- December 2019
Location
Marker shows the centre of Barren County; the queue data does not give exact sites.
Other requests in Barren County
- Flat Run SolarSolar Β· 55.0 MW Β· agreement signed
- Solar + storage project AH2-021, Barren CountySolar + storage Β· 150 MW Β· in study
- Solar project AH2-002, Barren CountySolar Β· 80.0 MW Β· in study
- Solar + storage project AE1-247, Barren CountySolar + storage Β· 205 MW Β· withdrawn
- Scotland SolarSolar Β· 100 MW Β· withdrawn
- Solar project AE1-246, Barren CountySolar Β· 85.0 MW Β· withdrawn
- Wood Duck 100 MWSolar Β· 55.0 MW Β· withdrawn
- Wood Duck 100 MWSolar Β· 45.0 MW Β· withdrawn
- Solar project AG1-067, Barren CountySolar Β· 38.0 MW Β· withdrawn
- Solar + storage project AG2-317, Barren CountySolar + storage Β· 35.0 MW Β· withdrawn
- Flat Top SolarBattery storage Β· 26.0 MW Β· withdrawn