SOLAR · PJMFlat Run Solar
Flat Run Solar is a 55.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Barren County, Kentucky, connecting to EKPC.
Queue statusConsented
- PlanningQueued Aug 2019 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AF1-083
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Green County-Saloma 161 kV
- Location
- Barren County, Kentucky
- Technology
- Solar: 55.0 MW
- Total requested
- 55.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 31 August 2019
- Proposed online date
- December 2026
Location
Marker shows the centre of Barren County; the queue data does not give exact sites.
Other requests in Barren County
- Solar + storage project AH2-021, Barren CountySolar + storage · 150 MW · in study
- Solar project AH2-002, Barren CountySolar · 80.0 MW · in study
- Solar + storage project AE1-247, Barren CountySolar + storage · 205 MW · withdrawn
- Solar project AF1-163, Barren CountySolar · 120 MW · withdrawn
- Scotland SolarSolar · 100 MW · withdrawn
- Solar project AE1-246, Barren CountySolar · 85.0 MW · withdrawn
- Wood Duck 100 MWSolar · 55.0 MW · withdrawn
- Wood Duck 100 MWSolar · 45.0 MW · withdrawn
- Solar project AG1-067, Barren CountySolar · 38.0 MW · withdrawn
- Solar + storage project AG2-317, Barren CountySolar + storage · 35.0 MW · withdrawn
- Flat Top SolarBattery storage · 26.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem