SOLAR Β· WEST

Solar project 119, Columbia County

Solar project 119, Columbia County is a 150 MW solar request withdrawn in the West interconnection queue, in Columbia County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
119
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Dodge Junction 230 kV Substation
Location
Columbia County, Washington
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
25 August 2021
Proposed online date
March 2024

Location

Marker shows the centre of Columbia County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Columbia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem