πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G0298, Columbia County

Onshore wind project G0298, Columbia County is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Columbia County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0298
Grid region
West (non-ISO utilities)
Connection point (POI)
Little Goose 500 kV Substation
Location
Columbia County, Washington
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
19 November 2007
Proposed online date
December 2009

Location

Marker shows the centre of Columbia County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Columbia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem