United States › Grid › Interconnection queues › Washington
ONSHORE WIND · WEST300MW Lower Monumental-Starbuck
300MW Lower Monumental-Starbuck is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Columbia County, Washington, connecting to RES North America.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G77
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- RES North America
- Developer
- RES North America
- Connection point (POI)
- Lower Monumental-Starbuck 500 kV line.
- Location
- Columbia County, Washington
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 21 September 2001
- Proposed online date
- June 2004
Location
Marker shows the centre of Columbia County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Columbia County
- Onshore wind project G0294, Columbia CountyOnshore wind · 250 MW · agreement signed
- Onshore wind project G0295, Columbia CountyOnshore wind · 250 MW · agreement signed
- Solar + storage project G1086, Columbia CountySolar + storage · 359 MW · in study
- Solar + storage project G1070, Columbia CountySolar + storage · 220 MW · in study
- Solar project G0847, Columbia CountySolar · 150 MW · in study
- Lower Snake Phase 1Onshore wind · 250 MW · built
- Tucannon River Wind FarmOnshore wind · 250 MW · built
- Onshore wind project 122, Columbia CountyOnshore wind · 211 MW · built
- Hopkins Ridge WindOnshore wind · 150 MW · built
- Onshore wind project 856, Columbia CountyOnshore wind · 23.4 MW · built
- Hopkins Ridge AdditionOnshore wind · 7.0 MW · built
- Onshore wind project G0298, Columbia CountyOnshore wind · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem