SOLAR + STORAGE Β· MISOSolar + storage project J2290, Avoyelles Parish County
Solar + storage project J2290, Avoyelles Parish County is a 130 MW solar + storage request withdrawn in the MISO interconnection queue, in Avoyelles Parish County, Louisiana, connecting to CLECO POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2290
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- CLECO Yellow Bayou 138kV Substation
- Location
- Avoyelles Parish County, Louisiana
- Technology
- Solar: 130 MW Β· Battery
- Total requested
- 130 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 17 February 2022
- Proposed online date
- October 2025
- Withdrawn
- October 2023
Location
Marker shows the centre of Avoyelles Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Avoyelles Parish County
- Solar project J3170, Avoyelles Parish CountySolar Β· 200 MW Β· in study
- Battery storage project J3581, Avoyelles Parish CountyBattery storage Β· 200 MW Β· withdrawn
- Solar + storage project J3659, Avoyelles Parish CountySolar + storage Β· 90.3 MW Β· withdrawn
- Solar project J3367, Avoyelles Parish CountySolar Β· 88.0 MW Β· withdrawn
- Solar project J664, Avoyelles Parish CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem