United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
ONSHORE WIND Β· MISOOnshore wind project J2591, Choctaw County
Onshore wind project J2591, Choctaw County is a 500 MW onshore wind request withdrawn in the MISO interconnection queue, in Choctaw County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2591
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- WOLF CREEK 500 kV
- Location
- Choctaw County, Mississippi
- Technology
- Wind: 500 MW
- Total requested
- 500 MW
- Service type
- NRIS and ERIS
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- October 2028
- Withdrawn
- July 2025
Location
Marker shows the centre of Choctaw County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Choctaw County
- Solar project 522, Choctaw CountySolar Β· 67.0 MW Β· in study
- Other project 84Other Β· 875 MW Β· built
- Other project 84, Choctaw CountyOther Β· 875 MW Β· built
- Other project 70, Choctaw CountyOther Β· 815 MW Β· built
- Other project 70Other Β· 815 MW Β· built
- Other project , Choctaw CountyOther Β· 480 MW Β· built
- Other project Other Β· 480 MW Β· built
- Other project 50, Choctaw CountyOther Β· 800 MW Β· withdrawn
- Onshore wind project J2698, Choctaw CountyOnshore wind Β· 500 MW Β· withdrawn
- Other project J2692, Choctaw CountyOther Β· 500 MW Β· withdrawn
- Solar + storage project 472, Choctaw CountySolar + storage Β· 300 MW Β· withdrawn
- Solar + storage project 508, Choctaw CountySolar + storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem