United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 472, Choctaw County
Solar + storage project 472, Choctaw County is a 300 MW solar + storage request withdrawn in the Southeast interconnection queue, in Choctaw County, Mississippi, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 472
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Choctaw County, Mississippi
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Queue status
- Withdrawn
- Entered queue
- 2 April 2021
- Proposed online date
- December 2023
Location
Marker shows the centre of Choctaw County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Choctaw County
- Solar project 522, Choctaw CountySolar Β· 67.0 MW Β· in study
- Other project 84Other Β· 875 MW Β· built
- Other project 84, Choctaw CountyOther Β· 875 MW Β· built
- Other project 70, Choctaw CountyOther Β· 815 MW Β· built
- Other project 70Other Β· 815 MW Β· built
- Other project , Choctaw CountyOther Β· 480 MW Β· built
- Other project Other Β· 480 MW Β· built
- Other project 50, Choctaw CountyOther Β· 800 MW Β· withdrawn
- Onshore wind project J2698, Choctaw CountyOnshore wind Β· 500 MW Β· withdrawn
- Other project J2692, Choctaw CountyOther Β· 500 MW Β· withdrawn
- Onshore wind project J2591, Choctaw CountyOnshore wind Β· 500 MW Β· withdrawn
- Solar + storage project 508, Choctaw CountySolar + storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem