United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G0252, Yakima County

Onshore wind project G0252, Yakima County is a 350 MW onshore wind request withdrawn in the West interconnection queue, in Yakima County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0252
Grid region
West (non-ISO utilities)
Connection point (POI)
Wautoma 500 kV Substation
Location
Yakima County, Washington
Technology
Wind: 350 MW
Total requested
350 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
19 December 2006
Proposed online date
September 2008

Location

Marker shows the centre of Yakima County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Yakima County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem