United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR Β· WEST

Solar project 55, Pima County

Solar project 55, Pima County is a 100 MW solar request withdrawn in the West interconnection queue, in Pima County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
55
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
PinalWest345-Southloop345
Location
Pima County, Arizona
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
30 January 2017
Proposed online date
December 2018

Location

Marker shows the centre of Pima County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Pima County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem