United States βΊ Grid βΊ Interconnection queues βΊ Florida
OTHER Β· SOUTHEASTOther project 3
Other project 3 is a 25.0 MW other request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 3
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- Seminole's TFUC Line From S. Clewiston to Cowbone
- Location
- Florida
- Technology
- Other: 25.0 MW
- Total requested
- 25.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Study Phase: Feasibility System Impact; Status: Study Complete and sent to SERF November 2009. Study withdrawn by custom
- Queue status
- Withdrawn
- Entered queue
- 3 September 2009
- Proposed online date
- December 2011
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem