Other project 3

Other project 3 is a 25.0 MW other request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
3
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
Seminole's TFUC Line From S. Clewiston to Cowbone
Location
Florida
Technology
Other: 25.0 MW
Total requested
25.0 MW
Service type
NRIS and ERIS
Study phase
Study Phase: Feasibility System Impact; Status: Study Complete and sent to SERF November 2009. Study withdrawn by custom
Queue status
Withdrawn
Entered queue
3 September 2009
Proposed online date
December 2011

Location

No county location in the queue data.