πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

BATTERY STORAGE Β· WEST

Battery storage project C3-131, Salt Lake County

Battery storage project C3-131, Salt Lake County is a 199 MW battery storage request withdrawn in the West interconnection queue, in Salt Lake County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C3-131
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Oquirrh substation
Location
Salt Lake County, Utah
Technology
Battery: 199 MW
Total requested
199 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
15 May 2023
Proposed online date
December 2027

Location

Marker shows the centre of Salt Lake County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Salt Lake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem