United States › Grid › Interconnection queues › Virginia
SOLAR · PJMSolar project AH2-100, Prince Edward County
Solar project AH2-100, Prince Edward County is a 20.0 MW solar request in interconnection study in the PJM interconnection queue, in Prince Edward County, Virginia, connecting to Dominion.
Queue statusIn planning
- PlanningQueued Jan 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-100
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Briery Substation 29.4kV
- Location
- Prince Edward County, Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 31 January 2022
- Proposed online date
- December 2023
Location
Marker shows the centre of Prince Edward County; the queue data does not give exact sites.
Other requests in Prince Edward County
- Solar project AI1-145, Prince Edward CountySolar · 125 MW · in study
- Solar project AG2-198, Prince Edward CountySolar · 80.0 MW · in study
- Battery storage project AG2-566, Prince Edward CountyBattery storage · 30.0 MW · in study
- Solar project AH2-101, Prince Edward CountySolar · 5.0 MW · in study
- Solar project AC1-162, Prince Edward CountySolar · 240 MW · withdrawn
- Keysville PV I, LLCSolar · 186 MW · withdrawn
- Solar project AF2-171, Prince Edward CountySolar · 150 MW · withdrawn
- Solar project AG1-176, Prince Edward CountySolar · 150 MW · withdrawn
- Battery storage project AH1-731, Prince Edward CountyBattery storage · 107 MW · withdrawn
- Battery storage project AH1-750, Prince Edward CountyBattery storage · 100 MW · withdrawn
- Solar project AH2-005, Prince Edward CountySolar · 20.0 MW · withdrawn
- Solar project AD2-082, Prince Edward CountySolar · 15.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem