SOLAR Β· PJMSolar project AG1-176, Prince Edward County
Solar project AG1-176, Prince Edward County is a 150 MW solar request withdrawn in the PJM interconnection queue, in Prince Edward County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-176
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Briery-Clover 230 kV
- Location
- Prince Edward County, Virginia
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 16 September 2020
- Proposed online date
- November 2023
- Withdrawn
- August 2023
Location
Marker shows the centre of Prince Edward County; the queue data does not give exact sites.
Other requests in Prince Edward County
- Solar project AI1-145, Prince Edward CountySolar Β· 125 MW Β· in study
- Solar project AG2-198, Prince Edward CountySolar Β· 80.0 MW Β· in study
- Battery storage project AG2-566, Prince Edward CountyBattery storage Β· 30.0 MW Β· in study
- Solar project AH2-100, Prince Edward CountySolar Β· 20.0 MW Β· in study
- Solar project AH2-101, Prince Edward CountySolar Β· 5.0 MW Β· in study
- Solar project AC1-162, Prince Edward CountySolar Β· 240 MW Β· withdrawn
- Keysville PV I, LLCSolar Β· 186 MW Β· withdrawn
- Solar project AF2-171, Prince Edward CountySolar Β· 150 MW Β· withdrawn
- Battery storage project AH1-731, Prince Edward CountyBattery storage Β· 107 MW Β· withdrawn
- Battery storage project AH1-750, Prince Edward CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project AH2-005, Prince Edward CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AD2-082, Prince Edward CountySolar Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem