BATTERY STORAGE Β· PJM

Battery storage project AH1-750, Prince Edward County

Battery storage project AH1-750, Prince Edward County is a 100 MW battery storage request withdrawn in the PJM interconnection queue, in Prince Edward County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedMay 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-750
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Pine Lake Solar LLC
Location
Prince Edward County, Virginia
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Proposed online date
November 2029
Withdrawn
May 2025

Location

Marker shows the centre of Prince Edward County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Prince Edward County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem