United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

SOLAR + STORAGE Β· WEST

Solar + storage project GI-CS-2025-15, El Paso County

Solar + storage project GI-CS-2025-15, El Paso County is a 195 MW solar + storage request withdrawn in the West interconnection queue, in El Paso County, Colorado, connecting to Tri-State Generation and Transmission Association.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-CS-2025-15
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tri-State Generation and Transmission Association
Connection point (POI)
Lincoln-Midway 230kV Line
Location
El Paso County, Colorado
Technology
Solar: 195 MW Β· Battery
Total requested
195 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
25 September 2025
Proposed online date
December 2028

Location

Marker shows the centre of El Paso County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in El Paso County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem