SOLAR + STORAGE Β· WESTSolar + storage project GI-CS-2025-15, El Paso County
Solar + storage project GI-CS-2025-15, El Paso County is a 195 MW solar + storage request withdrawn in the West interconnection queue, in El Paso County, Colorado, connecting to Tri-State Generation and Transmission Association.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-CS-2025-15
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Tri-State Generation and Transmission Association
- Connection point (POI)
- Lincoln-Midway 230kV Line
- Location
- El Paso County, Colorado
- Technology
- Solar: 195 MW Β· Battery
- Total requested
- 195 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 25 September 2025
- Proposed online date
- December 2028
Location
Marker shows the centre of El Paso County; the queue data does not give exact sites.
Other requests in El Paso County
- Gas project GI-2006-1e, El Paso CountyGas Β· 483 MW Β· agreement signed
- Onshore wind project GI-2007-12, El Paso CountyOnshore wind Β· 250 MW Β· agreement signed
- Solar project GI-2017-52, El Paso CountySolar Β· 36.0 MW Β· agreement signed
- Gas project CSUT-2025-7, El Paso CountyGas Β· 412 MW Β· in study
- Solar + storage project GI-2025-08, El Paso CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project CSU-2020-3, El Paso CountySolar + storage Β· 200 MW Β· in study
- Battery storage project CSUT-2025-6, El Paso CountyBattery storage Β· 100 MW Β· in study
- Battery storage project CSUT-2025-8, El Paso CountyBattery storage Β· 100 MW Β· in study
- Solar project CSUT-2025-2, El Paso CountySolar Β· 100 MW Β· in study
- Gas project CSU-2020-2Gas Β· 178 MW Β· built
- Solar project CSU-2018-1Solar Β· 60.0 MW Β· built
- Solar project GI-2019-1, El Paso CountySolar Β· 450 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem