United States › Grid › Interconnection queues › Pennsylvania

ONSHORE WIND · PJM

AES Armenia Mountain Wind, LLC

AES Armenia Mountain Wind, LLC is a 0.5 MW onshore wind request built and operating in the PJM interconnection queue, in Bradford County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Jun 2009 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingAug 2010 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
V2-019
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Mansfield-S. Troy 115kV
Location
Bradford County, Pennsylvania
Technology
Wind: 0.5 MW
Total requested
0.5 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
18 June 2009
Proposed online date
August 2010
Came online
August 2010

Location

Marker shows the centre of Bradford County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Bradford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem