GAS · SOUTHEASTGas project 416, Lee County
Gas project 416, Lee County is a 42.0 MW gas request built and operating in the Southeast interconnection queue, in Lee County, Florida, connecting to Florida Power & Light.
Request details
- Queue ID
- 416
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Fort Myers Sub
- Location
- Lee County, Florida
- Technology
- Gas: 42.0 MW
- Total requested
- 42.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 18 September 2020
- Proposed online date
- May 2024
- Came online
- May 2024
Location
Marker shows the centre of Lee County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem