SOLAR + STORAGE Β· WEST

Solar + storage project Q66, Los Angeles County

Solar + storage project Q66, Los Angeles County is a 248 MW solar + storage request withdrawn in the West interconnection queue, in Los Angeles County, California, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2018 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q66
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
Rosamond 230kV Switching Station
Location
Los Angeles County, California
Technology
Solar: 124 MW Β· Battery: 124 MW
Total requested
248 MW
Queue status
Withdrawn
Entered queue
28 December 2018
Proposed online date
October 2021
Withdrawn
October 2019

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem