Onshore wind project G0422, Wheeler County

Onshore wind project G0422, Wheeler County is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Wheeler County, Oregon.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0422
Grid region
West (non-ISO utilities)
Connection point (POI)
Fossil Substation
Location
Wheeler County, Oregon
Technology
Wind: 100 MW
Total requested
100 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
9 April 2010
Proposed online date
April 2013

Location

Marker shows the centre of Wheeler County; the queue data does not give exact sites.

Power plants in Oregon Β· Transmission lines in Oregon

Other requests in Wheeler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem