ONSHORE WIND Β· WESTOnshore wind project G0427, Wheeler County
Onshore wind project G0427, Wheeler County is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Wheeler County, Oregon.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2010 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0427
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- TBD
- Location
- Wheeler County, Oregon
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 30 April 2010
- Proposed online date
- April 2013
Location
Marker shows the centre of Wheeler County; the queue data does not give exact sites.
Other requests in Wheeler County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem