United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR + STORAGE Β· PJMSolar + storage project AF2-108, Dinwiddie County
Solar + storage project AF2-108, Dinwiddie County is a 10.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Dinwiddie County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2020 (completed)
- Withdrawn / abandonedAug 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-108
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Locks 34.5 kV
- Location
- Dinwiddie County, Virginia
- Technology
- Solar: 10.0 MW Β· Battery
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 25 February 2020
- Proposed online date
- October 2022
- Withdrawn
- August 2022
Location
Marker shows the centre of Dinwiddie County; the queue data does not give exact sites.
Other requests in Dinwiddie County
- Solar + storage project AH2-268, Dinwiddie CountySolar + storage Β· 37.0 MW Β· in study
- Solar project AE2-313, Dinwiddie CountySolar Β· 314 MW Β· withdrawn
- Solar project AE1-235, Dinwiddie CountySolar Β· 180 MW Β· withdrawn
- Battery storage project AG1-449, Dinwiddie CountyBattery storage Β· 122 MW Β· withdrawn
- Battery storage project AG2-506, Dinwiddie CountyBattery storage Β· 100 MW Β· withdrawn
- Reams SolarSolar Β· 80.0 MW Β· withdrawn
- Battery storage project AF1-266, Dinwiddie CountyBattery storage Β· 74.5 MW Β· withdrawn
- Solar + storage project AE1-249, Dinwiddie CountySolar + storage Β· 70.0 MW Β· withdrawn
- DW-Lew Jones SolarSolar Β· 20.0 MW Β· withdrawn
- Solar project AI2-032, Dinwiddie CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem