United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

BATTERY STORAGE Β· PJM

Battery storage project AF1-266, Dinwiddie County

Battery storage project AF1-266, Dinwiddie County is a 74.5 MW battery storage request withdrawn in the PJM interconnection queue, in Dinwiddie County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandonedJun 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF1-266
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Invenergy Solar Project Development LLC
Connection point (POI)
Clubhouse-Sapony 230 kV
Location
Dinwiddie County, Virginia
Technology
Battery: 74.5 MW
Total requested
74.5 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
30 September 2019
Proposed online date
December 2022
Withdrawn
June 2024

Location

Marker shows the centre of Dinwiddie County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Dinwiddie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem