United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· WESTOnshore wind project GI-0505, Gregory County
Onshore wind project GI-0505, Gregory County is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Gregory County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2005 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0505
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Ft. Randall
- Location
- Gregory County, South Dakota
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 28 January 2005
Location
Marker shows the centre of Gregory County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem