SOLAR Β· WESTSolar project 854, Kane County
Solar project 854, Kane County is a 190 MW solar request withdrawn in the West interconnection queue, in Kane County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 854
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Sigurd-Glen Canyon transmission line
- Location
- Kane County, Utah
- Technology
- Solar: 190 MW
- Total requested
- 190 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN - LACK OF READINESS
- Queue status
- Withdrawn
- Entered queue
- 14 March 2017
- Proposed online date
- December 2020
Location
Marker shows the centre of Kane County; the queue data does not give exact sites.
Other requests in Kane County
- Solar + storage project NC5-010, Kane CountySolar + storage Β· 500 MW Β· in study
- Solar + storage project NC5-001, Kane CountySolar + storage Β· 480 MW Β· in study
- Solar project 805, Kane CountySolar Β· 95.0 MW Β· in study
- Solar project 710, Kane CountySolar Β· 204 MW Β· withdrawn
- Battery storage project C3-138, Kane CountyBattery storage Β· 100 MW Β· withdrawn
- Solar + storage project C3-127, Kane CountySolar + storage Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem