SOLAR + STORAGE Β· WEST

Solar + storage project 114, Pima County

Solar + storage project 114, Pima County is a 500 MW solar + storage request withdrawn in the West interconnection queue, in Pima County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
114
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
Tortolita 500kV
Location
Pima County, Arizona
Technology
Solar: 500 MW Β· Battery
Total requested
500 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
22 February 2022
Proposed online date
April 2026

Location

Marker shows the centre of Pima County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Pima County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem