SOLAR Β· SOUTHEASTSolar project LGE-GIS-2018-007, Fleming County
Solar project LGE-GIS-2018-007, Fleming County is a 120 MW solar request withdrawn in the Southeast interconnection queue, in Fleming County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2018-007
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Goddard - Flemingsburg tap 138 kV line
- Location
- Fleming County, Kentucky
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 1 October 2018
- Proposed online date
- June 2022
Location
Marker shows the centre of Fleming County; the queue data does not give exact sites.
Other requests in Fleming County
- Fleming SolarSolar Β· 189 MW Β· agreement signed
- Solar project AH1-664, Fleming CountySolar Β· 100 MW Β· in study
- Solar project AH1-666, Fleming CountySolar Β· 80.0 MW Β· in study
- Solar project AH1-665, Fleming CountySolar Β· 80.0 MW Β· in study
- Solar + storage project AH2-383, Fleming CountySolar + storage Β· 70.0 MW Β· in study
- Solar + storage project AI1-133, Fleming CountySolar + storage Β· 50.0 MW Β· in study
- Solar project AH1-429, Fleming CountySolar Β· 90.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem