United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· PJMSolar project AH1-429, Fleming County
Solar project AH1-429, Fleming County is a 90.0 MW solar request withdrawn in the PJM interconnection queue, in Fleming County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-429
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Developer
- ACE Development Company, LLC
- Connection point (POI)
- Flemingsburg - Spurlock 138 kV
- Location
- Fleming County, Kentucky
- Technology
- Solar: 90.0 MW
- Total requested
- 90.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 10 September 2021
- Proposed online date
- September 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of Fleming County; the queue data does not give exact sites.
Other requests in Fleming County
- Fleming SolarSolar Β· 189 MW Β· agreement signed
- Solar project AH1-664, Fleming CountySolar Β· 100 MW Β· in study
- Solar project AH1-666, Fleming CountySolar Β· 80.0 MW Β· in study
- Solar project AH1-665, Fleming CountySolar Β· 80.0 MW Β· in study
- Solar + storage project AH2-383, Fleming CountySolar + storage Β· 70.0 MW Β· in study
- Solar + storage project AI1-133, Fleming CountySolar + storage Β· 50.0 MW Β· in study
- Solar project LGE-GIS-2018-007, Fleming CountySolar Β· 120 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem