BATTERY STORAGE Β· PJM

Battery storage project AG1-240, Botetourt County

Battery storage project AG1-240, Botetourt County is a 90.0 MW battery storage request withdrawn in the PJM interconnection queue, in Botetourt County, Virginia, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedDec 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-240
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Trinity 69 kV
Location
Botetourt County, Virginia
Technology
Battery: 90.0 MW
Total requested
90.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
25 September 2020
Proposed online date
June 2024
Withdrawn
December 2020

Location

Marker shows the centre of Botetourt County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Botetourt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem